| |
|
Entry Date
|
Nick Name
|
Location
|
|
Monday, April 27, 2009
|
|
klancy
|
Westford, MA
|
|
Entry 39 of 287 |
|
|
|
|
Kearns 2009, 4/26. 80 degrees sunny, After untwisting the 2'rebar from the tiller I managed to finish the Main Patch (far) and the Top Patch (near). Top patch added prior to till, 2 x 40# bags Humus/Manure, 50# bag dehydrated manure, to crown, along with: 7# humic acid, 3 C. kelp, 1 C.worm poop, 3 C. Blood meal, and 6 C. Grubex. to whole Top Patch. I distributed 5 Gal. C.Tea mixed w/Fish Emulsion and 50 Gal. water, to Top P.crown, and around plastic Crown area on Main P.
|
|
|