| |
|
Entry Date
|
Nick Name
|
Location
|
|
Thursday, May 19, 2005
|
|
crammed
|
Thornhill, Ontario, Canada
|
|
Entry 104 of 299 |
|
|
|
|
To secure the structure to the ground, I needed to pound in some rebar. I should be able to get away with 24" long pieces all around. Although, I got some 36" long bars just in case.
To get through all that wood, I needed a long drill bit. So, I used a 1/2" spade bit that is 16" long.
|
|
|