|
Entry Date
|
Nick Name
|
Location
|
Tuesday, April 05, 2022
|
|
Curtis UK
|
Woodley, Reading, UK
|
|
Entry 7 of 62 |
|
|
|
|
150sqft patch is ready to go. Soil heating cable in, topped up to a depth of 4ft with spent coir, drip irrigation installed and fertiliser applied. 934.3 Leach 2021 (HDA) will be planted in about 10 days time with a mini hoophouse to raise air temperature. Still lots to do elsewhere, but reassuring to get something completed.
|
|
|