|
Entry Date
|
Nick Name
|
Location
|
Monday, May 08, 2017
|
|
The Pumpkin
|
Kirkwood, MO
|
|
Entry 52 of 105 |
|
|
|
|
I did already prep both stump sites. After digging down 3 feet I installed soil heating cables, and mixed the soil dug out with
1/2 bag pro mix,
1 bag worm castings
1 bag ancient forest
2 bags ocean forest potting soil
After backfilling I put a mound on the stump site. I was able to stick my whole arm down to my shoulder with out any resistance
|
|
|