|
Entry Date
|
Nick Name
|
Location
|
Sunday, October 04, 2015
|
|
Richmond Dave
|
Richmond, BC
|
|
Entry 97 of 104 |
|
|
|
|
Ready for next year ! 1) all vines removed and taken to the dump, 2) whole patch weeded, 3) soil ppm meter tested and recorded 16 sites of the patch, 4) pH readings on same 16 sites, 5) soil sample taken at those sites to be sent to A&L Labs for analysis, 6) 4 tbsp. of Cabrio( pyroclostrobin) hose end sprayed over patch to try to kill any residual PM. 7) Miller time
|
|
|