Home What's New Message Board
BigPumpkins.com
Select Destination Site Search
Grower Diaries
 
Entry Date Nick Name Location
Monday, March 08, 2010 DHertz Waterville, Ohio

Entry 2 of 28  
Grower Diary Menu
  Back to Previous Page
Show Full 2010 Diary
List Other Grower's Diaries
Submit to Your Own Diary
Patch Prep 2010
(Patch was built on top of a leach field)
-Septic Tank drained(may have caused the high Na levels)
-Drainage pipes installed.
-One hothouse built(one to go, plans from J.Jutras from World Class Giant Pumpkins 4)

What I have added
4 yds of Sandy loam top soil
2 yds Compost
2 yds Shredded Leaves
19 cu ft or 200lbs of Peatmoss
120 lbs Gypsum
40 lbs Bonemeal
6.5lbs 0-0-50
2 gallons Mollasses
 



Top of Page

Questions or comments? Send mail to Ken AT bigpumpkins.com.
Copyright © 1999-2026 BigPumpkins.com. All rights reserved.